Here, you'll find a summary of all the great new features, enhancements, improvements, and fixes that our Product Development team continuously brings to Kantata OX. To learn more about our future roadmap, see Upcoming Releases.
Here, you'll find a summary of all the great new features, enhancements, improvements, and fixes that our Product Development team continuously brings to Kantata. To learn more about our future roadmap, see Upcoming Releases.
2025
December
December 15-19 Additional Enhancements
Kantata AI
- Fixed an issue that was preventing the Project Agent and Status Report Agent from being refreshed.
Resource Management
- Fixed an issue that was preventing some resources from displaying when adding resources to projects in the new Projects tab of Resource Center. You can now view up to 200 results when searching for a specific resource if that many matches exist.
Project Management
- Fixed an issue in the Project side panel where the Go to Project link was not fully visible for projects with long names.
- Fixed an issue with Pulse surveys where the response to the first question was saved when recipients selected an option in the Pulse email instead of after selecting the Continue button on the survey page. For recipients whose email providers use security bots, this was causing incorrect responses to be saved or responses to be saved without the recipients actually taking the survey.
- Fixed an issue with Pulse surveys where after returning to a previous question and selecting a different answer, the scale would display both answers as selected.
Financial Management
- The hover tooltip that appears on the Project Revenue chart now includes the month and year of the financial period and the information that appears now display in the following order: Budget, Recognized, Calculated, Forecast.
Time and Expense
- Fixed an issue with the Group by Project view in Time Approvals where an Add a message pop-up was appearing after selecting the approve timesheet button.
Reporting
- The following attributes and facts are now available in Insights for custom reporting on project accounting records:
- Project Accounting: Override in Effect
- Project Accounting: Revenue Recognition Method
- Project Accounting: System Generated
- Project Accounting: Amount in Cents
- Project Accounting: Amount to Date in Cents
- Project Accounting: Budget in Cents
- Project Accounting: Calculated Revenue in Cents
- Project Accounting: Cost EAC in Cents
- Project Accounting: Cost in Cents
- Project Accounting: Fees in Cents
- Project Accounting: Forecasted Revenue in Cents
- Project Accounting: Hours (in Minutes)
- Project Accounting: Hours EAC (in Minutes)
- Project Accounting: Hours ETC (in Minutes)
- Project Accounting: Total Estimated Hours (in Minutes)
- Project Accounting: Total Hours to Date (in Minutes)
Integrations
- You can now import the
quantity,markup_type,markup_percentage, andmarkup_per_unit_in_subunitsfields to the Expense Budgets data set for the Smart Upload Manager. - Fixed an issue in the M-Bridge integration platform that was causing unrelated errors to be printed to the Exceptions page for the "Users | NetSuite to Mavenlink | NetSuite Employees to Mavenlink Users" scenario of the NetSuite integration.
Miscellaneous
- To more easily surface visibility in your organization for support cases with Kantata, you can now add people as case collaborators, which ensures that they receive updates about the support case.
- You can now post updates to your support case in the support portal instead of replying via email.
December 8-12 Additional Enhancements
Kantata AI
- For accounts that have accepted the updated Kantata AI terms and conditions, a refresh button is now available in the Resource Agent that helps the Agent handle data more efficiently.
Resource Management
- The Allocate Member modal has been renamed Staff Unnamed Resource. This action is also now available in the new Resource Center tabs as an action in the More menu for unnamed resources.
Financial Management
- Fixed an issue in the Account Revenue and Project Revenue charts that was causing months to either disappear or duplicate when viewed by users in certain timezones. This data is now based on UTC, which displays properly for all timezones.
- Fixed an issue in the project and account Revenue tabs that was preventing forecast and revenue amounts from displaying properly when using Expense Budgets, especially when expense budgets were fixed fee or included markup.
- Fixed an issue where values were always displaying with the USD currency symbol in the Override Revenue modal in the project's Revenue tab under the Financials tab.
- Fixed an issue in the project's Revenue tab under the Financials tab where calculated revenue was being counted multiple times across the periods when two or more periods were Open or Unsubmitted.
- Fixed an issue where calculations for forecasts were not including scheduled hours on the last day of the month in the project's Revenue tab under the Financials tab.
Reporting
- The following attributes and facts are now available in Insights for custom reporting on billing milestones:
- Billing Milestone: Billing Type
- Billing Milestone: ID
- Billing Milestone: Invoice Status
- Billing Milestone: Taxable
- Billing Milestone: Title
- Billing Milestone: Title Aggregate
- Date (Billing Milestone Invoiceable Date)
- Billing Milestone: Amount in Cents
December 1-5 Additional Enhancements
Resource Management
- Fixed an issue in the Resource side panel where role names were not displaying properly in the Team Member drop-down, making them harder to read.
- Fixed a visual issue in the Edit Resource modal when using the Safari web browser that caused the blue border of an input field to overlap the field name labels when entering a value in the field.
Project Management
- Fixed a visual issue in the Resource Estimated Hours column in Task Tracker where the profile picture for unnamed resources was not displaying properly, making it harder to see the initials for the role and determine the difference between unnamed resources.
- Fixed a rounding issue in Task Tracker that was sometimes causing values in the Actual Fees column to be off by one cent.
Integrations
- External reference related filters are now available when fetching expense budgets via the API.
- Fixed an issue with importing expense budgets via the Smart Upload Manager where the expense budgets were not actually being created if the
external_idcolumn had a value. - Fixed an issue with the Smart Upload Manager where creating a new expense budget would update a previously-imported expense budget instead.
November
Highlights
Added
Resource Management / Resource Center
Releasied on November 11, 2025
Standardize your custom views in the Resource Center and share them with your team! Shared Views help your team stay aligned by ensuring that everyone has access to see the same resourcing information.
For more information, see the Shared Views Overview article.
Early Access
Override Project Revenue Amount
Financial Management
Released on November 11, 2025
Account Administrators and those with appropriate Access Group permission can now override the system-calculated revenue amount before closing a period. When overriding, you can enter a note to explain the valid, auditable reason for the override.
For more information, see the Revenue Management [Early Access] article.
Early Access
Financial Management
Released on November 11, 2025
The chart on the Account Financials page is now a bar chart, giving you a clearer comparison between the calculated and recognized revenue month-over-month. This also makes it easier to compare these numbers to historical forecasted revenue when that data becomes available on this page in the future.
For more information, see the Revenue Management [Early Access] article.
Changed
View Pulse Participation Details and Resend Surveys
Project Management / Pulse
Released on November 11, 2025
To help project managers track and boost Pulse survey participation, the Pulse Survey Responses page now displays more information about survey participation. Depending on your Access Group permissions, you can now see each recipient’s participation activity and overall score or the overall participation rate. You can also resend the survey to individual recipients or to all non-respondents and copy shareable survey links.
For more information, see the Pulse in the Project Workspace article.
November 24-28 Additional Enhancements
Kantata AI
- Fixed an issue that was preventing the Project Agent and Status Report Agent from responding to prompts and being refreshed.
Resource Management
- The Remaining Hours filter is now available in the new Projects tab in Resource Center.
- Fixed a display issue in Resourcing areas where the Calendar icons in the Add Scheduled Hours and Edit Scheduled Hours modals were overlapping with text in the date fields.
Project Management
- Fixed an issue with Pulse where clicking the Send feedback button in surveys would not proceed to the survey end page.
Financial Management
Time and Expense
- Fixed an issue in the Account Revenue and Project Revenue panels that was causing approved timesheets that had been previously rejected to appear as unapproved time in the submission and closing checklists.
- When an unapproved timesheet has days that span both the previous and current financial period, the timesheet will now only appear under unapproved time for the period you are viewing if there are time entries logged for days in that financial period.
API
- The Subscribed Events API now tracks changes to the following revenue management related fields for Project Accounting Records:
forecast,has_revenue_override,calculated_revenue_amount, andrevenue_override_notes.
November 17-21 Additional Enhancements
Resource Management
- Fixed an issue in the new Team Members tab of Resource Center where all projects were not appearing in the Add to Project drop-down menu.
Project Management
- Fixed an issue in the project's Activity Feed that was preventing team members with View Tasks Project Permissions from seeing public posts.
- Fixed an issue with the Health section in the Project side panel that allowed you to click the Save button without filling out all required fields, resulting in the form becoming stuck.
Financial Management
- On the Project Revenue table, values in the Revenue column are now blue when in an Open period to indicate that the values are based on calculated data.
Time and Expense
- Fixed an issue on the Time Entries page where the Export XLSX button was not working when clicked.
Account Settings
- Fixed an issue in the URL & Login tab of Custom Branding settings where the favicon based on the custom uploaded logo was labeled as "Kantata" instead of "Custom".
Integrations
- A patch is available for Salesforce Version 2.11 to fix an issue where the Kantata OX project was not being archived and the Salesforce project was not being deleted when the Salesforce Opportunity or Opportunity Line Item (OLI) was deleted and the Enable Auto Project Delete option was activated. To receive the patch, please contact Support.
- The Expenses data set in the Smart Upload Manager has been updated to support associating expense budgets to expenses.
Miscellaneous
- Fixed a visual issue on the Your Dashboard page that caused information in the People section to display improperly if the logged-in user had a long name. The name listed under Profile is now truncated if it does not fit within the Profile area.
- Fixed an issue on the Your Dashboard page that was preventing the Expand/Collapse icon for the People section from working properly.
November 10-14 Additional Enhancements
Resource Management
- The legend in the new Resource Center tabs has been updated to reflect the new look and feel of the allocated and scheduled hours bars. The legend in the Team Members tab also includes visuals for time off and holidays that appear in the timeline for this tab.
Project Management
- The Recurring Date / Task Completion label and options in Pulse areas have been updated to During Project.
- Fixed an issue with Task Tracker that was causing horizontal scroll to not work.
- Fixed an issue with the Project List that was causing pagination options to not display.
Financial Management
- On the Project Revenue chart, forecasted, calculated, and recognized revenue amounts within a period all now appear together when hovering over a data point. Previously, these only appeared individually when hovering over that specific data point.
- In the Project Revenue panel, a new Calc. Revenue field appears for all current and past financial periods that shows you the revenue amount based on the calculated data in Kantata OX, helping you to identify if this is different that the Revenue amount due to an override or data changing after the project revenue is submitted for approval.
- A warning icon now appears next to Revenue field in the Project Revenue panel if the values in the Revenue and Calc. Revenue fields are not equal.
- Text in all currency fields—such as Revenue and Revenue to Date fields—in Account Financials and Project Revenue tables are now consistently aligned to the right side of the column.
Reporting
- Updated user availability data in Insights to consider allocated hours. Previously, Insights only considered the account creation date, the oldest scheduled hours, or the oldest time entries when calculating user availability, which could result in inaccuracy when reporting on user availability.
Integrations
- The Project Financial Periods data set is now available in the Smart Upload Manager.
November 3-7 Additional Enhancements
Resource Management
- Fixed an issue where clicking Resource Center links from places like Resource Request emails or Availability Inspector pop-ups would not automatically filter to the specific resource.
- Project names in the new Projects tab of Resource Center are now hyperlinked, allowing you to easily access the project workspace by clicking the project name.
Project Management
- Number custom fields in Forms now allow values to be up to 15 digits—like in the Project side panel. Previously, only up to 10 digits were allowed.
Financial Management
- Fixed an issue on the Account Financials page that was sometimes preventing the Revenue by Project table from loading properly.
- Fixed an issue in the Project Revenue side panel where the Approve all expense reports option in the Submission Checklist automatically displayed an unchecked icon when expense approvals were not activated for a project. Now, this checkbox can be manually checked if expense approvals are not required.
- Fixed an issue that was preventing revenue from projects from being recognized when the project was not submitted for approval prior to the period being closed.
Integrations
- A patch is available for Salesforce Version 2.11 to fix the issues listed below. To receive the patch, please contact Support.
- Templates were not being applied (as configured in the Opportunity Template Field or Product Template Field Name integration options) to new Kantata projects created from a Salesforce Opportunity or Opportunity Line Item (OLI) when the staging table is activated.
- The Kantata project lead’s email address was not syncing to the Project Manager field in Salesforce.
Miscellaneous
- You can now double-click on longer posts that are collapsed in the Dashboard's Activity Feed to expand the content and read it. Double-clicking the post content after it is expanded will collapse the content again.
- For a more consistent experience across Kantata OX, some font formatting has been updated. These changes include size and bolding of in-app text.
October
Highlights
Added
Configure Columns in Resource Center
Resource Management / Resource Center
Releasing on October 14, 2025
You can now customize the information that appears in the Resource Center, allowing you to:
- Hide the information you don't need
- Expose data that was previously unavailable—like custom fields, Future Allocated Hours, Future Scheduled Hours, or Request Status
- Resize each column individually or resize the entire column list
- Sort by specific columns
You can create unique Saved Views to help you quickly switch between different staffing processes like submitting or approving Resource Requests, visualizing workload capacity, or managing utilization for your team.
For more information on configuring columns in the Resource Center, see the Columns in Resource Center: Team Members Tab [Early Access], Columns in Resource Center: Projects Tab [Early Access], and Configuring Columns in the Resource Center articles.
Added
Project Custom Fields in Resource Center
Resource Management / Resource Center
Releasing on October 14, 2025
In the Projects tab of Resource Center, you can introduce Project custom fields to your views to provide you with at-a-glance information that can help fill in decision-making gaps, streamline staffing processes, and deliver all the information you need in one place.
For more information, see the Configuring Columns in the Resource Center article.
Added
Project Management / Pulse
Released on October 14, 2025
To help project managers quickly and easily gather feedback when needed, a new Send One Time option has been added in project Pulse Settings. You can schedule Pulse surveys for internal teams and clients on any date you choose, providing more opportunities to surface valuable feedback that can ensure project success.
For more information, see the Project Settings: Pulse Settings article.
October 27-31 Additional Enhancements
Kantata AI
- Improved the Resourcing Agent’s responses to prompts that refer to custom fields.
- The Resourcing Agent can now create and update custom field values.
Resource Management
- Fixed an issue that was preventing in-app links to Resource Center from working properly.
Project Management
- When you select a response in a Pulse survey the Skip button changes to a Continue button, allowing you to advance to the next question and saving the selected response.
- When selecting a Pulse survey response in an email, a browser window now opens in a new tab where you can click Continue to save your response before choosing to continue completing the survey.
October 20-24 Additional Enhancements
Project Management
- Fixed an issue that was allowing the Send One Time survey type to appear in the Create Question Sets modal.
Financial Management
- In the project's Revenue tab, only financial periods with financial data like hours or expenses will display on the chart and table. If no periods have financial data, only the month that the project was created is visible in the chart and table.
- Fixed an issue for the Fees per Month tab in the project workspace that prevented projects with a large amount of data from properly loading the chart and table.
Reporting
- Fixed a background color styling issue in the Notes column for the Analytics Time Tracking report.
Integrations
- Fixed an issue with the Projects: Invite Users to New Projects Kantata Connect recipe that caused the recipe to trigger for updated projects instead of only newly created projects. To receive the fix on your Kantata Connect account, you must re-import the recipe.
Miscellaneous
- Fixed a styling issue in the Notification Settings page that was causing branding colors to be improperly applied to the Primary email column.
October 13-17 Additional Enhancements
Kantata AI
- Fixed an issue with the Status Report Agent where clicking Generate Report caused the page to refresh.
- Improved the Resourcing Agent's responses to prompts related to staffing.
Resource Management
- When a profile picture has not been added for an account member, the initials of the member's first and last name now appear in the Team Members column in the new Team Members tab.
- Improved performance of the new Team Members tab, enhancing initial page loads and pagination when there are multiple pages of resources to click through.
- Improved the contrast of text background colors for allocated and scheduled hours on the Resource Center timeline for better readability.
Project Management
- Fixed an issue in the Task side panel where links were sometimes not opening in a new tab or not opening at all.
Financial Management
- Fixed an issue that was allowing Financial Management features to appear for plans other than Premier or Enterprise.
- Added more error messages to the Account Financials page.
- In Revenue pages, these pages no longer reload when actions like submit, approve, or reject are taken. Instead, revenue data is now updated if there are any applicable changes.
- Fixed an issue in the project's Revenue tab that was causing the current period to be incorrectly labeled as Upcoming when assigning a Revenue Recognition Method to a project.
- Fixed an issue with email and in-app notifications that was causing the Invoice Billing Milestones Reminder notification to send daily. Now, they are sent only on the Date to Invoice as intended.
- Fixed an issue in the Fees per Month page that was sometimes preventing data from loading.
API
- Changes made to project accounting will now appear in Recent History and Project History. You can see when project accounting records are created and deleted. The changes will also appear in the Subscribed Events API as the following events:
project_accounting_record:created-
project_accounting_record:updated(Triggered when a project accounting record is soft deleted via the Remove Records option) project_accounting_record:deleted
- Changes made to billing milestones will now appear in Recent History and Project History. You can see when billing milestones are created, updated, and deleted. The changes will also appear in the Subscribed Events API as the following events:
billing_milestone:createdbilling_milestone:updatedbilling_milestone:deleted
Miscellaneous
- Made some small styling and color improvements to have a more consistent look and feel across Kantata OX.
- Improved performance app-wide for Kantata Pulse users.
October 6-10 Additional Enhancements
Kantata AI
- Fixed an issue that temporarily caused the Resourcing Agent's responses to not appear.
Resource Management
- When reassigning scheduled hours in the early access Resource Center tabs, this information now updates in the respective columns without requiring a page refresh.
- In the early access Team Members tab of Resource Center, your last selection for rows per page now persists after you refresh the page.
- When clearing or distributing scheduled hours in bulk in the early access Resource Center tabs, this information now updates in the respective columns without requiring a page refresh.
- When aligning scheduled time in the Task side panel in the early access Resource Center tabs, this information now updates in the timeline without requiring a page refresh.
- When editing scheduled hours assignments in the Task side panel in the early access Resource Center tabs, this information now updates in the timeline without requiring a page refresh.
- When editing custom fields in the Project side panel in the early access Resource Center tabs, this information now updates in the respective columns without requiring a page refresh.
- Clicking a user's name in the early access Projects tab in the Resource Center now opens the User side panel.
- Availability Inspector is now available in the early access Projects tab of Resource Center.
Project Management
- When applying non-budgeted templates to projects, tasks are now created as non-billable or billable based on the Task Default project setting.
- The unanswered surveys count has been removed from the Pulse option in the left navigation.
Financial Management
- Fixed an issue in the Fees per Month page that was not respecting the day set for Calculation Using Actual Fees Through in the Time & Expense Settings.
- Fixed an issue that was allowing users to access the early access Financials tab in the left navigation without the proper Access Group permissions.
API
- Fixed an issue in the API that was causing timeouts with Daily Scheduled Hours (Story Allocation Days) endpoints.
Miscellaneous
- Fixed an issue that was causing the Generate Status button for Project Status Agent to appear in the Task side panel.
October 1-3 Additional Enhancements
Resource Management
- Improved performance of the Remaining Hours filter in the early access Team Members tab in Resource Center, resulting in faster load times for views that include named resources.
September
Highlights
Early Access
Financial Management / Project Management
Released on September 23, 2025
The Revenue Management feature aids finance and project managers in completing monthly revenue recognition and period close processes from the following pages:
- Project Revenue—Under a project's Financials tab, this page shows calculated, recognized, and forecasted revenue per period based on the project's revenue recognition method. Team members with appropriate permissions can review all data related to the project’s revenue, confirm during period close that revenue is accurate and complete, and indicate that the project is ready for approval before the period is closed.
- Account Financials—This new account-level page provides a holistic view of revenue recognition data across projects, allowing finance managers to drill into details for each project or period, confirm revenue, and close financial periods.
Account financial settings and Access Group permissions help you control who can access and modify this sensitive data, as well as the actions members can complete.
Note: We recommend adopting this feature early if:
- You are not using a financial integration.
- You recognize revenue at the project level.
- You use the following methods to recognize revenue: Time & Materials, % Complete (Hours), or % Complete (Cost).
For more information, see the Revenue Management [Early Access] article.
Early Access
Expand All in Early Access Resource Center
Resource Management / Resource Center
Released on September 23, 2025
In the early access Resource Center tabs, quickly reveal all projects, resources, and tasks. With just one click, the Expand icon gets you the information you need to see faster—just like in the legacy tabs.
For more information, see the Configure Columns in Resource Center: Team Members Tab [Early Access] and Configure Columns in Resource Center: Projects Tab [Early Access] articles.
Changed
Project Management / Pulse
Released on September 23, 2025
To help project managers better understand Pulse survey results, scores are now broken down by individual responses or sentiment. If you have permission to see respondent names, you can see how each respondent answered each question; otherwise, you’ll see responses broken down by sentiment—negative, neutral, and positive. This provides more visibility into survey responses and allows you to drill in on specific questions, identify outliers, and perform personalized follow-ups.
For more information, see the Pulse in the Project Workspace article.
Changed
Refreshed Look and Feel for Dashboards, Timesheets, and More
Miscellaneous / Timesheets / Dashboard
Released on September 23, 2025
Kantata OX has a more modern and consistent look—with additional subtle changes continuing to roll out over the next few months. With improved colors and text styling, this visual refresh was designed with accessibility in mind. You’ll notice these improvements most in Timesheets, and Your Dashboard, but it will positively affect many other areas of the platform as well.
September 29-30 Additional Enhancements
Project Management
- Fixed an issue in Task Tracker that was requiring an extra click in the Assignees column to assign members to tasks.
September 22-26 Additional Enhancements
Kantata AI
- Changes made by the Resourcing Agent will now immediately appear on the page. Previously, this required a page refresh.
Resource Management
- Improved performance when expanding role rows to view unnamed resources in the early access Team Members tab.
- Made styling improvements to the Add Scheduled Hours and Edit Scheduled Hours modals in Resourcing areas.
- Improved performance of the Remaining Hours filter in the early access Team Members tab in Resource Center, resulting in faster load times for views that include unnamed resources.
Financial Management
- The Revenue Recognition Method field in Project Settings, the Create a New Project page, and Forms has been renamed to Insights Revenue Recognition [Legacy]. When the Revenue Management feature is activated on the Early Access page, a new field Revenue Recognition Method is available that is related to our new revenue recognition functionality.
API
- Updated the expense budgets API to ensure that
nullis returned in the markup amount field that the expense budget does not use. e.g. When themarkup_typeisflat_fee,markup_percentagewill benull; when themarkup_typeispercentage,markup_per_unit_in_subunitswill benull. Previously, the markup amount field could return an empty value.
Integrations
- A patch is available for Salesforce Version 2.11 to fix an issue where syncing the project budget from an alternate field (e.g. with the Alternate Opp Project Budget Field option) was not working when the Salesforce org has multiple currencies enabled. To receive the patch, please contact Support.
September 15-19 Additional Enhancements
Kantata AI
- To better reflect the agentic framework powering Kantata AI features, the Project Assistant, Status Report Assistant, and Resourcing Assistant have been renamed to Project Agent, Status Report Agent, and Resourcing Agent.
Resource Management
- When performing bulk actions from the More menu in the early access Resource Center tabs, this information now updates in the respective columns without requiring a page refresh.
- Fixed a visual issue in the Add Allocations and Edit Allocations modals.
- When adding or editing scheduled hours in the Task side panel in the early access Resource Center tabs, this information now updates in the respective columns without requiring a page refresh.
Project Management
- Improved performance in Task Tracker.
- Fixed an issue with Pulse where the survey link in an email would sometimes open a blank page if the custom questions in a question set were deleted.
- Fixed an issue in project Pulse Settings where the Project End survey would sometimes disappear from the schedule after activating Project Start surveys.
- Fixed an issue in Task Tracker that was preventing estimated fees values in the Actual Fees column from rounding to the nearest cent.
- Fixed alignment of the date field for automatically approving time entries on the Project Settings and Create a New Project pages.
Time and Expense
- Fixed an issue on the Timesheets page that was preventing the Cancel button from appearing for users that don't have permission to approve their own time.
Integrations
- A patch is available for Salesforce Version 2.11 to fix an issue where syncing the project budget from an alternate field (via the Alternate Opp Project Budget Field or Alternate OLI Project Budget Field options) was not working when the Salesforce Managed Fields option was deactivated or Budget was not selected in the Salesforce Managed Fields option. To receive the patch, please contact Support.
September 8-12 Additional Enhancements
Resource Management
- When editing task information in the Task side panel in the early access Resource Center tabs, this information now updates in the respective columns without requiring a page refresh.
- When editing custom field information in the User side panel and Resource side panel in the early access Resource Center tabs, this information now updates in the respective columns without requiring a page refresh.
- Made styling improvements to the Add Allocations and Edit Allocations modals in Resourcing areas.
Project Management
- Fixed an issue where non-billable tasks in a template would be created as billable tasks when applying the template while creating a project with the Task Default option set to Billable.
API
- The following request and response fields are now available in the expense budgets API:
markup_per_unit_in_subunits,markup_percentage,markup_type, andquantity. - The Project Snapshots API now returns the following fields in the response:
start_date,due_date,budget_in_cents, andworkspace_id. - When fetching project snapshots via the API, you can now return only baseline snapshots with the
is_baselinequery parameter.
Integrations
- A patch is available for Salesforce Version 2.8 to support the Salesforce ICU Locale Formats change and to update Apex Classes and Apex Triggers that were below API version 45.0. To receive the patch, please contact Support.
- Fixed an issue with the Users: Match Cost Rate to Account Role Kantata Connect recipe where the user cost rate was not updated when the user did not already have a cost rate for the specified currency. To receive the fix on your Kantata Connect account, you must re-import the recipe.
- Fixed an issue with the Tasks: Copy Task Tag to Custom Field Kantata Connect recipe that caused tags without the specified prefix to be renamed when the task had a mix of tags with and without the prefix. To receive the fix on your Kantata Connect account, you must re-import the recipe.
September 1-5 Additional Enhancements
Kantata AI
- Improved the Resourcing Assistant's responses when a user prompt returns a large amount of results.
Resource Management
- Fixed a display issue in the early access Resource Center tabs where skills that do not use levels were showing a level 1.
- When adding and editing scheduled hours in Resourcing areas, you can now enter the total number of hours for that timeframe in a new Hours Total field, which will automatically update the Hours/Day field. For example, entering 9 hours when the start date is Sep 15, 2025 and the end date is Sep 18, 2025 will update the Hours/Day field to 3.
- When editing resource information in the Resource side panel in the early access Resource Center tabs, this information now updates in the respective columns without requiring a page refresh.
Project Management
- Fixed an issue with Pulse where retaking a survey would record multiple responses instead of overwriting the previous response, resulting in inaccurate Pulse scores.
- Fixed an issue in Task Tracker where duplicating a task would not retain the original task's Time Trackable setting when the user was not an Account Administrator.
API
- When creating or updating projects via the API, you can now set whether notes on time entries are required using the
require_notes_on_time_entriesparameter.
Integrations
- The Expense Budgets data set is now available in the Smart Upload Manager.
August
Highlights
Added
Kantata AI / Resource Management
Released on August 12, 2025
Unlock the full potential of Resource Center with the Resourcing Assistant. Powered by AI, the Resourcing Assistant will surface potential risks to timelines and financials, analyze project and resource data, and complete complex resourcing tasks from simple explanations—making resource and risk management easier than ever.
For more information, see the Resourcing Assistant Overview article.
Added
Timesheet Self-Approval Permission
Account Settings / Time & Expense
Released on August 12, 2025
Gain more control over timesheet approvals with a new Can approve their own timesheets permission within the Time Management Access Group set—previously named Time Tracking. Moving forward, only Account Administrators and users with this Access Groups permission will be able to approve their own timesheets.
For more information, see the Access Group Set: Time Management article.
Added
Project Status Filter in Global Boards
Project Management / Boards
Released on August 12, 2025
Giving you more options to narrow your focus, a Project Status filter is now available in Global Boards.
For more information, see the Global Boards article.
August 25-29 Additional Enhancements
Kantata AI
- Fixed an issue in the Resourcing Assistant where borders appeared around the Good response and Bad response icons.
- When sending a new message to the Project Assistant or Resourcing Assistant, the modal will now automatically scroll down so that your new message is at the top.
- To improve usability of the Project Assistant and Resourcing Assistant, the modal will now remain at the top of the message when a long message is produced and a button will appear that allows you to quickly scroll to the bottom.
Resource Management
- When editing skills or time off in the User side panel in the early access Team Members tab of Resource Center, this information now updates in the respective columns without requiring a page refresh.
- Improved the performance of the early access Team Members tab in Resource Center.
Reporting
- The member limit for classic Insights Access Groups has been increased from 5000 users to 8000 users.
August 18-22 Additional Enhancements
Kantata AI
- Improved functionality of the Resourcing Assistant, making confirmations more robust when creating and updating data.
- Fixed an issue with the Resourcing Assistant where the Send Feedback modal was appearing behind the Assistant modal.
Resource Management
- When adding a resource to a project in the early access Resource Center tabs that does not match the filter criteria, the new resource now appears on the page until you refresh the page or reapply filters.
- Fixed an issue with the Skills column in the early access Resource Center that was causing unexpected sorting order.
- Improved performance of Resource Center, resulting in faster load times for resources.
Project Management
- Fixed an issue in the Project Admin box that was causing resource names and roles to display improperly.
API
- Added support for external references on expense budgets. The
POST /external_references/create_or_updateendpoint now acceptsExpenseBudgetforsubject_type. You can also add an external reference while creating or updating an expense budget using thePOST /expense_budgetsandPUT /expense_budgets/{id}endpoints.
Miscellaneous
- Made color improvements to alert icons in several areas of Kantata OX.
August 11-15 Additional Enhancements
Kantata AI
- The Terms & Conditions for Kantata AI have been updated. You must acknowledge this updated information before you can activate any agents. Any previously activated agents will continue to work as expected.
Resource Management
- When duplicating a resource in the early access Resource Center pages, the new resources now appear on the page without requiring a page refresh.
- When shifting allocations in the early access Projects tab in Resource Center, the timeline will now update without requiring a page refresh.
Project Management
- You can now select the Time & Expense Tracking bulk action in Task Tracker even if you have selected tasks which are not allowed to have time tracked against them. Previously, the bulk option would be deactivated.
- In Global Boards, the task status filter is now based on specific statuses instead of task status types. Previously, for example, when you selected only Not Started, tasks with both Not Started and custom statuses with that status type would appear in the results.
- For better clarity and a more consistent user experience, the following options in the Project Settings and Create a New Project pages have been changed from toggles to checkboxes: Include archived tasks in percentage complete, Include non-billable time on invoices, Schedule and budget changes must be approved, Allow tracking time, Require notes on time entries, Time entries must be approved before invoicing, and Expenses must be approved before invoicing.
Integrations
- The Project Accounting Records data set is now available in the Smart Upload Manager.
- A patch is available for Salesforce Version 2.11 to fix an issue where the project lead was not added to new Kantata projects created from Salesforce Opportunities or OLIs when the staging table was activated. To receive the patch, please contact Support.
August 4-8 Additional Enhancements
Kantata AI
- Fixed an issue with the Project Assistant where the Send button remained deactivated after selecting a predefined prompt in the Help menu.
Resource Management
- When you have a large number of pinned filters—or applied filters—in the early access Resource Center pages, you can now scroll through the filter pills to view any filters that do not appear within the display.
- Improved performance in the early access Team Members tab in Resource Center, resulting in much faster load times when using the Remaining Hours filter.
Project Management
- Added tooltips in the Pulse tab in the project, the survey detail page, and the Project List page to clarify how the score is calculated.
- Updated the tooltips in the Schedule tab of project Pulse Settings to better align with question sets functionality.
- Fixed an issue where the Delete Project option was available in the Project Actions drop-down when the project contained financial data such as time entries, expenses, invoices, or timesheets.
- Fixed an issue with non-budgeted templates where non-billable tasks were being created instead of billable tasks when users with Edit Financials (or higher) project permissions were applying the template to a project that has the Task Default option set to Billable.
Time and Expense
- Fixed an issue that was preventing people with the proper permissions from accessing the Time Approvals page.
- Fixed an issue in Timesheets where a subtask would not display its full list of parent tasks when selecting the Prefill Project and Task Names From Previous Week option.
API
- Added the optional response field
permissions_labelto the participations API, which indicates whether a user has an edit permission, a view only permission, or a view permission with additional access. - Fixed an issue with the get expenses API endpoint where using the
updated_before,updated_after,created_before, orcreated_afterfilter would cause an error.
Integrations
- The “Expenses | NetSuite to Mavenlink | NetSuite Expense Reports to Mavenlink Expenses” scenario of the NetSuite integration in the M-Bridge integration platform now supports syncing NetSuite expense reports with the "paid" status.
Miscellaneous
- Live Chat has been removed from the Support menu in the App bar. You can still access Live Chat by selecting Contact Support. For more information, see Kantata OX Help and Support.
- Completed final updates for the refreshed Kantata logo.
August 1 Additional Enhancements
Project Management
- Fixed an issue with Pulse where the Edit Question Set modal would not load properly after you deleted a custom question then attempted to edit a question set that included the question.
July
Highlights
Added
Project Management / Pulse
Released on July 15, 2025
To help you tailor Pulse surveys to your teams and processes, custom question sets are available for Pulse. You can customize the content, number, category, and order of questions sent out in surveys. Created by Account Administrators and managed by project managers, question sets give you even more control and customization in Pulse.
For more information, see the Creating Custom Pulse Survey Question Sets article.
Early Access
More Task Columns in Resource Center
Resource Management / Resource Center
Released on July 15, 2025
Get more context about tasks in Resource Center with new columns in the Task row:
- Start Date
- Due Date
- Future Scheduled Hours
These columns will be available in both early access tabs—Projects and Team Members.
For more information, see the Configure Columns in Resource Center: Team Members Tab [Early Access] or Configure Columns in Resource Center: Projects Tab [Early Access] article.
Added
Project Management / Boards
Released on July 15, 2025
Giving you more options to narrow your focus, a Tags filter will be available in Global Boards.
For more information, see the Global Boards article.
Added
Project Management / Financial Management / Expenses
Released on July 15, 2025
Get more insight into how your actual expenses compare to the estimated costs and fees of your expense budget with two new columns—Tracked Expenses and Expenses Plus Markup.
For more information, see the Expense Budgets Overview article.
Early Access
Resource Center: Timeline Visual Enhancements
Resource Management / Resource Center
Released on July 7, 2025
The early access Resource Center timeline has a refreshed look and feel for both the Projects and Team Members tabs. You'll notice improved contrast for allocations, time off, and holidays, making it easier to review information at a glance. We’re also widening columns in the day and week views to better prevent information from being cut off.
For more information, see the Configure Columns in Resource Center: Team Members Tab [Early Access] article.
July 28-31 Additional Enhancements
Project Management
- Fixed an issue where archived projects were listed on the Pending Pulse Surveys page.
- When clicking the Save & Add Another button in Forms, the form now resets, allowing you to quickly enter new information for your next form.
Integrations
- A patch is available for Salesforce Version 2.11 to fix the issues listed below. To receive the patch, please contact Support.
- Syncing invoices to Salesforce with a large number of line items would result in an "Apex heap size too large" error.
- Updates to some OX projects were not syncing to Salesforce when the number of updated projects exceeded the batch size.
July 21-25 Additional Enhancements
Project Management
- Fixed an issue in the Pulse tab in projects where surveys sent on the same day were not sorted in chronological order in the scores table.
- Updated Pulse to remove all scheduled surveys once the project has been marked as completed and the Project End survey has been sent.
- The Provider Lead column name in the Project List and the exported file for Project List now match. Previously, the column name in the exported file was "Consultant Lead".
- Added a tooltip in the Pulse Dashboard beside the Pulse Score column to clarify how the score is calculated.
API
- When updating account memberships via the API, you can now set whether the user's manager can edit the user's skills using the
manager_can_edit_skillsparameter.
Integrations
- The Billing Milestones data set is now available in the Smart Upload Manager.
- The Invoices data set has been updated to support adding billing milestones to invoices via the Smart Upload Manager.
- Fixed an issue with the Flat File integration where importing time off entries with 0.0 or 0.00
timeamounts was causing the import to fail instead of deleting the time off entries in Kantata.
July 14-18 Additional Enhancements
Resource Management
- In the early access Projects tab of Resource Center, the EAC column no longer appears by default. If desired, you can add this column to your Saved Views. This change has no affect on any Saved Views that have been updated since the early access release of the Projects tab.
- Improved performance of Resource Center, resulting in faster load times when filtering by custom task statuses.
Project Management
- In the Pulse Question Library, the Recurring Date label has been updated to Recurring Date / Task Completion. Additionally, in the Create Custom Question modal, the Recurring Date option in the survey Type drop-down menu has also been updated to Recurring Date / Task Completion.
- Fixed an issue in the Global Task Board where users without financial-level Project Permissions on the Client side of the project were able to see Task Estimated Hours on a tasks.
Financial Management
- The chart in the Fees per Month tab has been renamed Estimate at Complete to better reflect the information in the chart.
Time and Expense
- Fixed an issue in Timesheets where the Billable checkbox on time entries was not updating accordingly after changing the task associated to the time entries.
Integrations
- A patch is available for Salesforce Version 2.11 to fix an issue where Kantata task currency custom fields were not updating when the integration was set up to create tasks in Kantata based on Opportunity Line Items (OLIs) via the Tasks for Specific Products setting. To receive the patch, please contact Support.
Miscellaneous
- Improved performance of the Your Dashboard page.
July 7-11 Additional Enhancements
Project Management
- Improved performance of the global Tasks Tracker.
- Fixed an issue with Task History where the previous parent task name wasn't displaying after changing a subtask into a parent task.
- Fixed an issue in the project's Activity Feed where some participants on the client side were able to see To Dos and posts made on To Dos without having Edit To Dos additional access in Project Permissions.
- Fixed an issue with Pulse that prevented survey emails from sending. This issue persisted between June 20 and July 2 and recurred on July 11. All surveys scheduled to be delivered during this time have been sent.
Financial Management
- A project's currency can no longer be changed to another type of currency if billing milestones have been added to the project.
API
- When fetching dynamic Insights dashboards via the API, you can now filter for standard or custom dashboards with the
standardquery parameter.
July 1-3 Additional Enhancements
Resource Management
- Fixed an issue in the project's Resourcing tab that was causing the timescale periods to be misaligned and display improperly.
Project Management
- Custom field columns in the Task Tracker now display up to 600 custom field choices, if there are that many choices available for the custom field.
June
Highlights
Added
Kantata Connect Recipe Catalog
Integrations / Kantata Connect
Released on June 24, 2025
To help you more easily leverage automation in Kantata, pre-built recipes are now available in Kantata Connect. The Recipe Catalog has 15+ automations related to projects, tasks, users, and resourcing and allows you to:
- Save time and reduce costs by automating administrative tasks
- Ensure project, user, and resourcing data integrity
- Reinforce best practices with automation
For more information, see the Kantata Connect Recipe Catalog Overview article.
Early Access
Configure Columns in Resource Center: Projects Tab
Resource Management / Resource Center
Released on June 17, 2025
The Configure Columns in Resource Center feature is now available for the Projects tab, allowing you to configure columns and save views that can help you effectively plan and staff your future projects—no matter which tab you prefer to manage your resourcing processes in.
You’ll also notice brand-new columns unique to the early access Projects tab like EAC, Start Date, and Due Date, as well as Resource custom fields.
For more information, see the Configure Columns in Resource Center: Projects Tab [Early Access] article.
Early Access
Hide or Show Legacy Resource Center Tabs
Account Settings / Resource Management / Resource Center
Released on June 17, 2025
To encourage your users to adopt the new Resource Center tabs, Account Administrators can leverage a new setting that determines whether the legacy tabs are visible in Resource Center. This setting will remain on the Resource Management Settings page for a short period after general release to allow your users to smoothly transition to the new tabs.
For more information, see the Resource Management Settings article.
June 30 Additional Enhancements
Project Management
- When using the workspace participation API, the
can_edit_expenseandcan_edit_timefields are now returned in the response. Thecan_schedule_their_hours, andcan_schedule_team_hours, andis_foreign_participantfields can also be included in the response via theoptional_fieldsparameter.
June 23-27 Additional Enhancements
Resource Management
- A loading icon now appears in the Resource Center after applying filters to indicate that some data is still loading on the page.
- When a team member is overscheduled in the early access Team Members tab, red shading only appears on the Team Member row and the scheduled hours bars on the Project row match the project color. Previously, an issue was causing the scheduled hours bars on the Project row to have also red shading.
Project Management
- Updated the project Overview tab to always show the Summary Bar. Previously, the Summary Bar in the Overview tab was not visible when the Summary Bar in Task Tracker was collapsed.
- Fixed an issue in Boards that was preventing files from displaying when attached to a post reply.
- Fixed an issue in Task Tracker where assignees would overflow from the Assignees column when there was a large number of task assignees, causing display issues.
- Fixed an issue with Pulse where an incorrect score was displaying in the Pulse Dashboard when two surveys were sent out on the same day.
Financial Management
- In a project's Fees per Month tab, the chart now shows how a project's budget has changed each month. Previously, only the current budget amount was represented in the chart.
Integrations
- Fixed an issue with the “Project - Issues - Two way” scenario of the Jira integration in the M-Bridge integration platform where Kantata tasks were not syncing to Jira if they were moved to a different parent task in Kantata and the Include Jira Subtasks setting was set to No.
June 16-20 Additional Enhancements
Project Management
- Added the Pause/On toggle to the project Pulse Settings page, allowing you to activate or pause Pulse without returning to the Activity tab.
- Fixed an issue in Global Boards that was causing the card count at the top of the lane to not update to "0 results" after applying filters when there were no results.
- Files in the project Files tab are now sorted by most recent.
Financial Management
- For better readability of the Fees per Month chart, the Forecast line now trails up from 0 in the previous month to the current month's forecasted amount. Previously, the forecast line started in the current month at the forecasted amount for that month.
- Currency amounts in the Fees per Month chart and table are no longer rounded to the nearest unit and now include subunits like cents. For example, $458.15 now displays as $458.15, but previously it would display as $458.
June 9-13 Additional Enhancements
Project Management
- The update project API endpoint now allows you to archive a project and change its stage in a single request. Previously, a 404 error was returned.
Financial Management
- Added styling and text improvements to the project's Fees per Month page, including visual updates like the project name appearing in the side panel, additional content explaining what affects actual and forecasted fees calculations, and alignment changes in the Fees per Month table.
Time and Expense
- Improved the error message that appears when you attempt to reject a timesheet that contains time entries that have been invoiced.
Reporting
- Fixed an issue on the Manage Dynamic Dashboards page where the icons in the Actions column were wrapping to two rows.
Integrations
- A patch is available for Salesforce Version 2.11 to support the Salesforce ICU Locale Formats change. To receive the patch, please contact Support.
Miscellaneous
- Fixed an issue with banners throughout the app where icons within banners were matching custom branding colors instead of displaying in the banner color.
- Continued updates of the refreshed Kantata logo.
- Fixed an issue with the left navigation where the Pending Pulse Surveys link was visible for users when Pulse was entirely deactivated on the account.
June 2-6 Additional Enhancements
Resource Management
- When adding team members to projects in the early access Team Members, the search field now behaves similarly to the Project List search, allowing you to search based on project ID, custom field values, and more. Previously, you could only search for a project based on the project name.
- Improved the styling of early access and legacy tags in the Resource Center tabs to more clearly show the distinction between the two. Early access tags are now green and legacy tabs are still yellow.
Project Management
- Fixed an issue in Task Tracker where the Budget =/= Est. Fees indicator dot in the Task Budget column was matching custom branding colors instead of displaying as a yellow dot.
- Fixed an issue in the project invitation modal where profile pictures were not appearing for external members in the To drop-down menu.
Financial Management
- The forecasted hours in the Fees per Month chart now only include hours after the date set for Project Estimate Calculation Options in account settings.
- Fixed an issue in the Fees per Month tab where the title of the hours column was not dynamically updating to Scheduled Hours when scheduled hours amount where displaying, which is based on an account's Project Estimate Calculation Options setting.
- Fixed an issue in the Billing Schedule that was preventing negative billing milestone amounts from being entered.
Account Settings
- Fixed an issue where the CNY currency was not displaying the proper format for the Cost Rate column in the account members export.
API
- The rate limit for the create project snapshot API endpoint has been updated. See the Kantata OX API Rate Limits article for more information.
May
Highlights
Early Access
Project Financials: Fees per Month
Financial Management / Project Management
Released on May 13, 2025
The Fees per Month feature in the project workspace gives you clear, real-time insight into EAC on a project month-over-month. The chart and table views let you explore your forecasted and actual fees in-depth for each period and allow you to see how these numbers align to the project budget.
For more information, see the Project Financials: Fees per Month [Early Access] article.
May 27-30 Additional Enhancements
Financial Management
- Fixed an issue in the Fees per Month tab's chart where actual fees calculations were including fees after the day specified in Project Estimate Calculation Options account settings.
Account Settings
- Fixed an issue in account settings that was preventing inactive account members from being reactivated if their assigned role was deleted after they were deactivated.
Miscellaneous
- Pulse survey emails now use the left navigation color from custom branding settings as the logo background, making white logos easier to see.
May 19-23 Additional Enhancements
Kantata AI
- Fixed an issue with the Project Assistant where it would incorrectly confirm that it successfully created something when an error actually occurred and nothing was created.
- The Project Assistant now has a better understanding of risks and will look at information such as health reports, Activity Feed posts, budget and EAC, due dates, allocations, and Pulse scores to identify risks—helping you keep the project on track.
- Changes made by the Project Assistant will now immediately appear on the page. Previously, this required a page refresh.
- The Project Assistant button has been moved from the main app bar to the lower-right corner. You can also now select and drag the button to move it around the page.
- You can now resize the Project Assistant modal.
- Fixed an issue with the Status Report Assistant where an error would occur when trying to create a status report for a project without a start date.
Resource Management
- Fixed an issue in the early access Team Members tab that was preventing the Unnamed filter from working properly when custom field filters were also applied.
Project Management
- Fixed an issue that was preventing templates from setting a project budget during project creation.
Time and Expense
- Fixed an issue in the Time Entry Form where the role was not updating after selecting a different project.
Integrations
- Fixed an issue with the Jira integration in the M-Bridge integration platform where the Jira epic name was not syncing to the Kantata OX task custom field for the "Boards - Sprints - One way" scenario.
Miscellaneous
- Fixed an issue with time off submissions that was sometimes preventing users from updating the end date.
- The In-app Help icon has been updated from a graduation cap to a stylized Kantata “K”. The In-app Help button has also been resized to better match the updated Project Assistant button.
May 12-16 Additional Enhancements
Kantata AI
- The Project Assistant now has access to allocation data.
- To improve performance of the Status Report Assistant, the Assistant is now restricted to the last 3 months for completed tasks and the last 6 months for completed milestones. Additionally, the Assistant only has access to the first 1000 characters of task descriptions.
Resource Management
- When you have a large number of pinned filters—or applied filters—in Resourcing pages, you can now scroll through the filter pills to view any filters that do not appear within the display.
- Improved the clarity of error messaging that appears when attempting to add an external member to an account that is already a member in that account.
- Fixed an issue in the early access Team Members tab that was preventing resource custom field filters from working as expected.
- When changing the allocation type in Resourcing and an allocation has start or end dates outside of the selected period, the allocation now splits into two allocations. For example, when changing all of a resource's soft allocations before May 30th to hard allocations, a soft allocation with a start date of May 25th and an end date of June 3 would split into a hard allocation for May 25th-30th and a soft allocation from May 31-June 3.
- Your filters and Saved Views on the early access Team Members tab are now persistent, allowing you to navigate back and forth between different tabs in the Resource Center without the views changing.
Project Management
- Fixed an issue in Boards with the Due Date lane set where completed issues were not appearing in the Completed column.
Financial Management
- When creating or editing billing milestones, you can now press the
Enterkey on your keyboard to complete your action instead of hitting the Save button.
API
- The Billing Milestones API is now generally available, allowing you to manage your Billing Schedule via Kantata Connect and the API.
- When creating or updating an invoice via the API, you can now add billing milestones to the invoice via the
billing_milestone_idsfield. - When fetching invoices or workspaces via the API, you can now also include billing milestones in the response by adding
include=billing_milestonesto the request URL.
Miscellaneous
- Resolved some visual display issues in the Account Member side panel.
May 5-9 Additional Enhancements
Kantata AI
- The Project Assistant now retains your chat history after you close and reopen the modal while remaining in the project workspace.
Resource Management
- Fixed an issue in the early access Team Members tab that was preventing users from pinning custom field filters in the Filters modal.
April
Highlights
Added
Kantata AI Settings and Access Group Permissions
Kantata AI / Account Settings
Released on April 15, 2025
A new AI Settings page is available that allows Account Administrators to easily manage which Kantata AI features are available on their account. Additionally, AI features are available only to Project Administrators who also have the permissions in a new Access Group set—allowing Account Administrators to finely control who has access to which AI features.
For more information, see the Kantata AI Overview article.
Added
Kantata AI / Project Management
Released on April 15, 2025
Kantata's new Project Assistant simplifies daily administrative tasks—boosting productivity and saving you time to focus on essential work. Powered by AI, the Project Assistant synthesizes data, activity, and files across the project, letting you quickly and effortlessly surface insights and take action. Controlled by a new Access Group permission and restricted to Project Administrators, you can limit who has access to the Project Assistant.
For more information, see the Project Assistant Overview article.
Added
Project Status Report Assistant
Kantata AI / Project Management
Released on April 15, 2025
Boost client confidence and ensure successful projects with the Project Status Report Assistant. Powered by AI, the Project Status Report Assistant sifts through project data and activity for you to create status reports—reducing the administrative burden for project managers and increasing efficiency. Controlled by a new Access Group permission and restricted to Project Administrators, you can limit who has access to the Project Status Report Assistant.
For more information, see the Project Status Report Assistant Overview article.
Early Access
Project Management / Billing
Released on April 15, 2025
The Billing Schedule feature gives you clear, real-time visibility into your project’s invoicing and payment-related activities. With this feature, you can:
- Separate your fixed fee billing milestones from your project plan
- See which billing milestones have been billed to clients and which are ready to invoice
- Find out which fixed fee invoices are outstanding and possibly overdue
All of this helps you to more effectively follow up on overdue invoices and manage cash flow.
For more information, see the Billing Schedule Overview [Early Access] article.
Early Access
Out of Office Filter in Resource Center
Resource Management / Resource Center
Released on April 15, 2025
With the Out of Office filter in the early access Team Members tab, quickly see which team members have time off or holidays in a given date range to help you better manage workload for your resources.
For more information, see the Resource Center Filters article.
April 28-30 Additional Enhancements
Project Management
- Improved clarity and helpfulness of in-app content when deleting templates.
April 21-25 Additional Enhancements
Kantata AI
- The Project Assistant now has access to the results of the last sent Pulse survey.
- Added a “Summarize Pulse survey responses” prompt to the list of suggested prompts in the Project Assistant.
Resource Management
- In the early access Team Members tab, you can now select Show More to display additional 100 tasks or projects, selecting this option multiple times to reveal all projects or tasks that a resource is assigned to. After all rows are displayed, you can select Show Less to once again display the first 50 rows.
Project Management
- Fixed an issue in the Project side panel where a team member's overlapping time off and allocations caused an incorrect EAC amount to display if the team member had no capacity.
- Fixed an issue in Boards that was preventing all users from being tagged in posts on To Dos.
- Fixed an issue in project Pulse Settings where the Pulse schedule was displaying both client and team questions for Project End surveys instead of only the questions for the selected project side.
Financial Management
- When the Billing Schedule feature is activated on the Early Access page, users with Edit Financials or Project Administrator Project Permissions can opt in on the Notification Settings page to receive email, in-app, and/or Slack notifications when billing milestones reach the Date to Invoice. These notifications can also be turned off for specific projects based on the project's email notification preference or if notifications are muted for that project.
- The Billing Schedule feature now appears under a Billing subtab within the Financials tab in the project workspace.
Reporting
- The Analytics report Project Details now includes biliing milestones amounts in the Budget section of the report header.
API
- When fetching tasks via the API, you can now filter for completed tasks with the
completedquery parameter. - When fetching tasks via the API, you can now filter tasks by when they were marked as completed with the
completed_betweenquery parameter. - Fixed an issue with the update task API endpoint where updating the
story_typeandstatusof a task in the same request was not working.
Miscellaneous
- Fixed a display issue in the left navigation that occurred only when a darker color was selected for Left Navigation Color in Custom Branding settings.
- When closing the Task side panel without saving an in-progress post, the alert confirmation modal that appears now provides clearer, more helpful wording.
April 14-18 Additional Enhancements
Resource Management
- Fixed an issue in Resource Center that was preventing users from opening Team Builder.
- When filtering in the legacy or early access Team Members tab of Resource Center, the number of scheduled hours in the summary row for unnamed resources now matches only the amounts on visible projects. Previously, this number was the sum of all projects, whether they matched the filtered criteria or not.
Project Management
- Fixed an issue in the Task Board where users without financial-level Project Permissions on the Client side of the project were able to see Task Estimated Hours on a tasks.
- Made minor design improvements to Pulse survey answer options for a better experience on mobile devices.
API
April 7-11 Additional Enhancements
Resource Management
- Fixed an issue in the Resource Center where hours in the resource row were not updating as expected after adding hours and applying different project filters.
- Improved performance in the Resource Center when selecting options in custom field filters.
Project Management
- Clicking the project link at the top of the Task and Project side panels now open the project in a new tab to provide you with a smoother experience where you can still reference the context of the previous page.
- Made minor design and functionality improvements to Pulse survey pages and answer options for a better experience on mobile devices.
Account Settings
- Fixed an issue that was allowing users with Access Group permissions to edit named resources to edit unnamed resources and that was allowing users with access group permissions to edit unnamed resources to edit named resources.
API
- When fetching time off entries via the API, you can now also include users' account roles in the response by adding
include=roleto the request URL.
Miscellaneous
- Continued updates of the refreshed Kantata logo.
- Fixed an issue with time off where the amount was sometimes defaulting to the maximum user hours for the day instead of the entered time.
April 1-4 Additional Enhancements
Project Management
- Fixed an issue in the Task side panel where values in the Task Est. Hours field were not displaying properly.
Integrations
- You can now import the
cost_budget_in_cents,status, andproject_planattributes to the Task data set for Smart Upload Manager.
March
Highlights
Added
Project Management / Pulse
Released on March 18, 2025
For more configurability in Pulse, you’ll be able to choose a response scale when creating custom Pulse questions. To help you verify your question design, the Add Question modal will also show a preview of the question.
For more information, see the Creating Custom Pulse Survey Questions article.
Added
Time Tracking Enhancements for Project Participants
Time & Expense / Project Management / Account Settings
Released on March 18, 2025
Gain even more configurability with time tracking rules in Kantata, which allows you to more broadly define which team members can manage time trackability for both your projects and tasks. You can:
- Control from account settings if Project Administrators and specific project participants can change if projects and tasks allow time tracking
- Designate from Project Permissions which users can change time tracking settings in a project
- Update whether time and expenses can be tracked to a task from Task Tracker
For more information, see the Managing Time & Expense Tracking Settings article.
Early Access
Faster Access to New Resource Center Features
Resource Management / Resource Center
Released on March 18, 2025
When Configure Columns in Resource Center is activated, you’ll now spend less time navigating by landing on the early access Team Members tab by default. When using links or bookmarks for the legacy Team Members page, you are also now directed to the new tab—unless you are not opted in to this early access feature.
For more information, see the Configure Column in Resource Center [Early Access] article.
March 24-28 Additional Enhancements
Resource Management
- Fixed an issue in the early access Team Members tab that was sometimes preventing rows from loading properly.
Project Management
- The Pulse Dashboard has been updated to include links to project workspaces.
- In the Pulse Summary on the Activity tab, updated the date label to "Next Recurring" to make it clearer that this date is for the next recurring date survey and not other survey types.
Integrations
- Fixed an issue with the Intacct integration in the M-Bridge integration platform where certain logs were not being created correctly for the "Mavenlink Timesheets to Intacct Task Timesheets" scenario and instead an error was logged.
Miscellaneous
- Continued updates of the refreshed Kantata logo.
- Fixed an issue with various tables in Kantata OX that was causing misalignment of column header names. Now, all column header text will be consistently aligned, whether the column allows sorting or not.
March 17-21 Additional Enhancements
Project Management
- Fixed an issue in Pulse where changing the frequency of recurring date surveys would adjust the send date of all future recurring date surveys except for the next one.
Integrations
- Added error messaging to the Intacct integration to indicate that a missing
MAVENLINK_IDvalue could be the cause of a server error.
March 10-14 Additional Enhancements
Project Management
- Fixed an issue in Forms that was preventing some users with the appropriate permissions from creating projects.
Integrations
- There is a new page in Kantata Connect where users with the Workflow Administrator permission can add a user to the account as well as assign a permission level—Workflow Administrator, Workflow Editor, or Workflow Monitor—to their account members. Team members with the required permission level can also edit a user's information via the Users page.
- A patch is available for Salesforce Version 2.11 with the following fix: Fixed an issue with staged syncing where syncing Opportunity Line Items asynchronously could rarely cause duplication. To receive the patch, please contact Support.
Miscellaneous
- You can now use markdown headers in areas that support markdown formatting, such as the Activity Feed, Task side panel, and Resource side panel.
March 3-7 Additional Enhancements
API
- For objects that support bulk creation via the API, the API documentation now has more information about how to bulk create objects. Supported objects include custom field values, time entries, tasks, and more.
Miscellaneous
- Improved the performance of Recent History and Project History for accounts with Extended History activated.
February
Highlights
Early Access
Resource Management / Resource Center
Released on February 18, 2025
In the early access Team Members tab, more details appear for time off and holidays in the Day and Week views, surfacing more information and allowing you to quickly make informed resource planning decisions.
Previously, a yellow line in the user row was the only indication of a holiday or scheduled time off. Now, you can also see the following details when you expand the user row:
- A Holiday or Time Off icon that indicates why they’ll be out of office
- The name of the holiday
- The amount of time off scheduled
For more information, see the Configure Columns in Resource Center [Early Access] article.
Added
Custom Task Status and Task Status Sets API Endpoints
API / Project Management
Released on February 19, 2025
Custom task statuses and task status sets are now available in Kantata Connect and the API, allowing you to manage more granular task data when creating customized workflows and automations in your integrations or custom applications.
For more information on which actions are available, see the following API documentation:
February 24-28 Additional Enhancements
Resource Management
- Improved performance of the early access Team Members tab, resulting in faster load times for team member rows, especially when the Skills and Role columns are visible.
Project Management
- Fixed an issue on the Project List page that was preventing options for loading for the Task Status Sets bulk action.
- Fixed an issue in the Tasks Board where the Time icon was appearing for tasks that were not time trackable.
February 17-21 Additional Enhancements
Project Management
- Fixed an issue in the Global Board where you were unable to make the Groups filter a pinned filter.
- Fixed an issue where selecting the Cancel button on the Project Settings page was not returning users to the project workspace.
- Fixed an issue in Global Task Tracker where task status changes were not saving.
Time and Expense
- Revised helpful text on the Time Entries page that explains the requirements that must be met before you can add time entries.
API
- When creating or updating a task via the API, you can now use the
statusfield to set the status—including custom statuses—and thestatefield to set the status type. - You can now update the task status set for multiple projects at once via the API.
- When fetching tasks via the API, a
statusfield is now included in the response, containing the status type of the task's status. - When fetching projects via the API, the
task_status_set_name,task_status_set_id, andtask_statusesfields are now included in the response. - When creating or updating a project via the API, you can now associate a task status set to the project via the
task_status_set_idfield.
February 10-14 Additional Enhancements
Project Management
- Fixed an issue where the custom branding logo was sometimes not appearing on Pulse survey pages.
API
- When creating or updating a task via the API, an Account Administrator can explicitly set the
time_trackablefield and override the default time tracking setting for new tasks.
Miscellaneous
- Our Kantata logo has a refreshed look and feel that we've begun rolling out to various places—starting with kantata.com and Kantata Connect.
February 3-7 Additional Enhancements
Resource Management
- Fixed an issue with Resource Requests where the Approver would sometimes be removed if you updated other information before submitting the request.
Project Management
- When you export information from the Project List, you can now see whether time tracking is activated or deactivated for a project.
- The column Track Time & Expenses has been added to Task Tracker. This column is also included in Task Tracker CSV exports.
- With a new bulk action, anyone with the proper permission can now bulk update whether tasks can have time and expenses tracked against them. For more information on who has access to this bulk action, see Task Tracker Bulk Actions.
- When Time Tracking Enhancements for Project Participants is activated on the Early Access page and time and expense account settings allow Project Administrators to manage time tracking settings, a new Additional Access permission is available to select on the Project Permissions page.
- Account members without permission to change time tracking settings can now delete tasks marked as Time Trackable as long time, expenses, and invoices are not associated to the task.
Time and Expense
- The new feature Time Tracking Enhancements for Project Participants is now available on the Early Access page. This feature allows Account Administrators to control if Project Administrators and designated project members can update whether or not time tracking is allowed for projects and tasks.
- To improve performance of the Time Entries page, users with Report Viewer (or higher) Account Permissions can now see an Include External Projects checkbox. Because this checkbox is not selected by default, any time that account members have tracked to external projects will be filtered out automatically, which allows the page to load time much faster.
- When time tracking is not allowed on a project and a task is marked as Time Trackable, a message now appears in the Task side panel to explain that time can't be tracked until the project setting is updated.
- Account members who can edit tasks but can't change time tracking settings are now able to change the task type of all tasks, regardless of time trackable settings.
Account Settings
- The Task data set in Data Exporter now includes a Track Time & Expenses field.
- The Project data set in Data Exporter now includes a Time Tracking field.
- On the Time & Expense Settings page, the Track Time Against section is now the second section on the page—placed conveniently closer to other time tracking settings.
API
- Changes made to the Allow tracking time project setting will now appear in Recent History and Project History. The change will also appear in the Subscribed Events API as a
workspace:updatedevent.
Miscellaneous
- Fixed an issue where the People widget on the Your Dashboard page was not appearing for some users.
January
Highlights
Added
Project Management / Templates / Time & Expense / Expenses
Released on January 14, 2025
To help with project management, expense budgets are now available in project templates. You can use templates to create standard, reusable budgets—saving time and resulting in more accurate project financials.
For more information, see the Create a Template article.
January 27-31 Additional Enhancements
Resource Management
- Fixed an issue in the Resource Center that was preventing some custom fields from being visible for users with the proper permissions.
Project Management
- Fixed an issue in the Task Tracker where a newly added resource didn't appear in the Resource Estimated Hours column after being assigned to multiple tasks via a bulk action.
- Improved performance of project-related pages for accounts with Pulse activated.
Integrations
January 20-24 Additional Enhancements
Project Management
- Fixed an issue with Pulse survey pages where white logos were not visible in the header. Now, the left navigation custom branding color is used on survey pages.
Reporting
- The following expense budget metrics now have a subscript character ( ͺ ) to indicate that they are supplemental. It is recommended to use the expense budget facts instead when reporting on expense budgets.
- ͺExpense Budget: Estimated Cost
- ͺExpense Budget: Estimated Cost per Unit
- ͺExpense Budget: Estimated Fees
- ͺExpense Budget: Estimated Fees per Unit
- ͺExpense Budget: Markup Amount per Unit
- ͺExpense Budget: Markup Amount per Unit (for Flat Rate Markup only)
- ͺExpense Budget: Total Markup Amount
Miscellaneous
- Improved the styling and resizing behavior for various configurable tables—tables that leverage the Configure Columns functionality—in Kantata OX, including, but not limited to, Dashboard Access, the early access Team Members tab in Resource Center, and Project History.
January 13-17 Additional Enhancements
Resource Management
- In the early access Team Members tab, added two new columns: Resource ID and Previous Resource ID.
- Fixed an issue that was preventing some users from editing and deleting allocations in the project's Resourcing tab.
Project Management
- Improved performance of Task History in the Task side panel.
- Fixed an issue with templates where resource skills, additional tabs, and expense budgets were not copied when the template was cloned.
- When filling out a form in the project workspace, the form only saves when all fields have valid values. Previously, the fields with valid information would save, but an error message would appear suggesting that all fields failed to update.
- Fixed an issue where options wouldn't appear in the Task Status Set drop-down in the Project List.
Time and Expense
- Fixed an issue in the Expense Budgets tab in a project where the page would go blank if you clicked the Add Expense Budget button before the table finished loading.
- Improved the readability of the tooltip for the Add Time button in the Time & Fees section of the Task side panel.
- Added scroll to the New Expense Budget modal to improve usability.
Account Settings
- The People widget in the dashboard can now be hidden via a new setting on the General Settings page.
January 6-10 Additional Enhancements
Resource Management
- The Availability By Date filter in Resource Center now gives you the option to enter availability based on allocation percentage. Previously, you could only enter a set number of allocated hours.
Project Management
- Fixed an issue in the Task Tracker where filtering by a default task status would also display custom task statuses of the same type.
- The settings icon in the Pulse tab in the workspace now opens a drop-down with options for Client Pulse Settings and Team Pulse Settings or—if one side is deactivated on the account—opens the project Pulse settings page directly.
- The Overall Pulse Score, Overall Team Score, and Overall Client Score columns in the Pulse Dashboard have been renamed to Pulse Score, Team Score, and Client Score.
- Fixed an issue where recurring date Pulse surveys were being sent when they were deactivated in the project and project start surveys were activated.
Time and Expense
- Fixed an issue where after deleting a task, the task was not removed from expense budgets.
Reporting
- Improved performance when cloning large dynamic dashboards in Insights.
- Fixed an issue with Insights where the markups on expenses logged to expense budgets were not included in the Invoice: Amount in Cents fact and Invoice Amount standard metric.
Account Settings
- The Save button on the Time & Expense Settings page is now in a fixed position in the top-right corner of the top bar.
Integrations
- The Slack integration library has been updated to be more compatible with infrastructure upgrades in M-Bridge.
Miscellaneous
- The Track Time Reminder - Direct Reports email notification now include minutes in the total workweek hours. Previously, these hours were rounded to the nearest hour.
Comments
0 comments
Please sign in to leave a comment.